Garland Power & Light
Home MenuReference Drawings – Distribution System
This section provides added detail regarding clearance and spacing when using multiple construction standards in different applications on the distribution system. It also provides specific requirements for the placement of GP&L identification markings.
The documents provided in this section are detailed and technical. If you need assistance with these documents, please call 972-205-2967.
Reference Drawings – Distribution System
- EXIBIT A - Single UG Service
- EXIBIT B - Double UG Service
- REF-1 Single Phase Inline with DDE Secondary Construction
- REF-2 Single Phase Vertical Construction (60 - 90 Deg)
- REF-3 Wood Two Phase Inline with Two Phase DE Underbuilt Construction
- REF-4 Wood Two Phase Inline with Single Phase DE Underbuilt Construction
- REF-5 Wood Two Phase Inline with Single Phase Vertical Slack Span Underbuilt Construction
- REF-6 Intersection of 2 - Wood Dual Phase Inline Arms
- REF-7 Wood Two Phase DE with Two Phase DE Underbuilt Construction
- REF-8 Wood Three Phase Inline with Single Phase DE Underbuilt Construction
- REF-9 Intersection of 2 - Fiber Dual Phase Inline Arms
- REF-10 Fiber Two Phase Inline with Two Phase DE Underbuilt Construction
- REF-11 Wood DDE (Three Phase to Two Phase) Construction
- REF-12 Wood Large Wire DDE (Three Phase to Two Phase) Construction
- REF-13 Wood Large Wire Three Phase Inline with Three Phase DE Underbuilt Construction
- REF-14 Wood Three Phase Inline with Three Phase Two Arm Inline Underbuilt Construction
- REF-15 Wood Three Phase Inline with Three Phase DE Underbuilt Construction
- REF-16 Wood Three Phase Inline with Single Phase DE Underbuilt Construction
- REF-17 Wood Three Phase Inline with Three Phase Inline Underbuilt Construction
- REF-18 Intersection of 2 - Wood Three Phase Inline Arms
- REF-19 Wood Two Phase DE with Two Phase DE (60 - 90 Deg) Underbuilt Construction
- REF-20 Wood Three Phase Inline with Two Phase DE (60 - 90 Deg) Underbuilt Construction
- REF-21 Wood Two Arm Three Phase Inline with Single Phase DE Underbuilt Construction
- REF-22 Wood Three Phase DE Slack Span Construction
- REF-23 Fiber Three Phase Inline with Single Phase DE Underbuilt Construction
- REF-24 Fiber Three Phase Inline with 2 - Single Phase DE Underbuilt Construction
- REF-25 Fiber Three Phase Inline with Two Phase Vertical DE Underbuilt Construction
- REF-26 Fiber Three Phase Inline with Two Phase DE Underbuilt Construction
- REF-27 Fiber Three Phase Inline with Three Phase DE Underbuilt Construction
- REF-28 Fiber Two Phase DDE (60 - 90 Deg) Construction
- REF-29 Single Phase Transformer with Secondary Cubicle
- REF-30 Single Phase Transformer with Secondary Cubicle Pad Detail
- REF-31 Two Single Phase Transformers with Secondary Cubicle (7.3 x 8.6')
- REF-32 Two Single Phase Transformers with Secondary Cubicle Pad Detail
- REF-33 PM Open Wye-Open Delta Transformer Bank
- REF-34 PM Open Wye-Open Delta Transformer Bank Pad Detail
- REF-35 Two Single Phase Transformers with Secondary Cubicle (10.6' x 4')
- REF-36 Median Streetlight Standard Transformer Base
- REF-37 Wiring Diagram for Controller on Tennis Court Lighting
- REF-38 4' Octagonal Concrete Pull Box
- REF-39 Single Phase Ganged Meter Assembly (Multi-Family Only)
- REF-40 Typical UG Service Multi-Meter Arrangement with Grouped Weatherhead
- REF-41 Subsurface Transformer Vault
- REF-41A Subsurface Transformer Vault
- REF-42 Detail for Typical Search Holes for Boring Conduit Placement
- REF-43 Pole Identification Plate Placement
- REF-44 Pole Plate Placement for Traffic Light Standard
- REF-45 (Foreign Pole) Pole Plate ID and Fuse Disc Placement
- REF-46 (GPL Pole) Pole Plate ID and Fuse Disc Placement