Garland Power & Light
Home MenuUnderground Construction Standards – Distribution System
GP&L groups material units together to form large, all-encompassing construction standards. This section addresses the Underground portion of the distribution system, which includes primarily the pad-mounted features of the standards.
The documents provided in this section are detailed and technical. If you need assistance with these documents, please call 972-205-2967.
Underground Construction Standards – Distribution System
- UG-2202 Install 2in PVC Conduit in a Trench
- UG-2203 Install 3in PVC Conduit in a Trench
- UG-2204 Install 4in PVC Conduit in a Trench
- UG-2206 Install Duct Bank
- UG-2212 Bore in 2in Poly Conduit
- UG-2213 Bore in 3in Poly Conduit
- UG-2214 Bore in 4in Poly Conduit
- UG-2216 Bore in 6in Poly Conduit
- UG-2250 Typical Cross Section of Ditch for UG Cables
- UG-2255 Easement Locations in Street Right-of-Way
- UG-2260 Easement Locations in Alley Right-of-Way
- UG-2285 Standard for Marking Secondary Cables
- UG-2290 Loop Numbering Detail for UG Primary Cables