Specifications for Transmission Service

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Consumers, generators or other utilities desiring to connect to the City of Garland/Garland Power and Light electric transmission system must do so under Interconnection Standards developed under NERC Standard FAC-001.

The following standards are to be used as a starting point for entities who want to connect to our transmission system. Final design of any interconnection needs to be coordinated through GP&L’s Transmission and Distribution Substation Engineering group.

Please contact David Grubbs at dgrubbs@gpltexas.org if you have any questions about the requirements or if you wish to initiate an interconnection.

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer